Détail de la mission
As part of a response to a call for tenders in Ghana, CA 17 International, partner of Rives & Eaux du Sud-Ouest, is proposing new opportunities for collaboration on a project aimed at increasing agricultural incomes and promoting inclusive, climate-resilient, and sustainable economic growth in rural communities within the joint intervention area of the programme.
The project aims to facilitate access to productive and environmentally friendly infrastructure to contribute to household income growth and the sustainable development of agricultural trade. The specific objectives are:
1. Improve access to water for agriculture through the rehabilitation, construction, and equipping of irrigation infrastructure (dams, solar pumping systems).
2. Strengthen the capacities of agricultural producers, notably through the creation and training of Water Users Associations (WUAs).
3. Promote sustainable and agroecological agricultural practices to increase yields while preserving natural resources.
4. Develop agricultural value chains, especially for rice and horticulture, to boost producers’ incomes.
5. Ensure the sustainable management of infrastructure by implementing maintenance mechanisms and local governance systems.
6. Integrate environmental and social dimensions through the implementation of impact studies (ESIA, ESMP, RAP) and appropriate mitigation measures.
7. Strengthen the institutional capacities of public actors (MoFA, GIDA, PMU) in planning, project management, monitoring & evaluation, procurement, and financial management.
Research profile: HYDROGEOLOGIST – F/M
Qualification and Experience :
– She/He must have a first degree in Geology, hydrology, environmental science or Civil Engineering and a second degree in any relevant field with 10 years’ experience. A member of relevant Professional Institution;
– At least 5 years’ experience in Practices as a hydrologist in donor funded projects;
– Demonstrate to be Conversant with Africa west Africa and Ghana /AFD or other internationally accepted standards in groundwater exploration;
– Demonstrate expertise in Borehole Drilling and Irrigation Installation Works.
Language :
Proficient in writing and speaking English
Regional Experience :
Familiarity and experience in Sub-Saharan Africa especially in West Africa and Ghana
Availability :
Available to be mobilized fully for the Short term(6months) for the Supervision of the Design and Build Contractor working on Installation of Borehole Irrigation Systems in the Savanna and North east regions of Ghana on full-time basis and part time basis during the other stages of the project life on requirement
The project duration is a fixed term of 13 months, with a conditional phase of an additional 33 months.
Application deadline: August 8, 2025.