Irrigation Modernization Specialist

Asian Development Bank (ADB)
Home-Based / Remote
Position Type: 
Consultancy
Organization Type: 
International Organization
Experience Level: 
Senior (10+ Years)
Degree Required: 
Advanced Degree (Master's or JD)

EXPIRED

Please note: this job post has expired! To the best of our knowledge, this job is no longer available and this page remains here for archival purposes only.

Objective and Purpose of the Assignment

 
 

The Support for Irrigation Modernization Program (SIMP) will assist India with embarking on an
irrigation modernization program of its major and medium irrigation schemes (MMI). Irrigation
modernization is the process of upgrading infrastructure, operations and management of irrigation
systems to sustain the water delivery service requirements of farmers and optimize production and water
productivity.

SIMP proposes apply global best practices for modernizing MMI in India and achieving greater irrigation
water use efficiency and crop water productivity. The main concept of the program is to support the
states and center with improving modernization investments using national and international best
practices to achieve a meaningful improvement in irrigated agriculture production in India. The strategy
envisaged under the program is two tiered:

(i) At the center level: (a) build awareness of WRD, RD & GR and states in subjects related to
irrigation modernization – particularly the approach and tools that were developed under the studies
mentioned above. The process would support defining strategic perspectives and options for irrigation
modernization in water stressed basins to communicate on SIMP initiatives and support candidate states
with preparing their MMI modernization plans; (b) strengthen design guidelines and streamline review and
approval processes; and (c) incentivize the states to join the program by financing MMI modernization
strategy and feasibility studies and providing trainings on irrigation modernization to WRD.

(ii) At the state level, SIMP will support candidate states with (a) building awareness of SIMP
irrigation modernization practices and promote and explore candidate schemes; (b) preparing feasibility
studies and irrigation modernization plans for specific irrigation schemes that will then assist the
state’s with preparing their detailed project reports (DPRs); (c) on an as need basis (depending on the
states’ knowledge of new irrigation modernization initiatives), providing expert advice during
preparation of detailed designs and tender documents; and (d) assisting them with identifying financing
for implementing the irrigation modernization plans.

Scope of Work

 
 

SIMP will be implemented in a phased approach. This assignment is for the first phase that will
establish a Central Irrigation Modernization Office (CIMO) under the Central Water Commission, WRD, RD &
GR, Ministry of Jal Shakti. Specifically, this phase will finalize the SIMP concept and framework with
WRD, RD & GR and initial participating states and convene a national workshop to discuss the program,
prepare the detailed SIMP design and implementation schedule. For the knowledge and awareness programs
on irrigation modernization, this phase will develop a program of events and study tours to benefit the
CIMO, WRD, RD & GR and participating states (events and study tour will commence in a subsequent phase).
This phase will also develop the strategy for supporting states with preparing their irrigation
modernization plans and projects, promote SIMP to water-stressed states, and help identify about 3-4
irrigation schemes as SIMP’s first batch for which the CIMO will guide the state in preparing irrigation
modernization plans. The CIMO operating needs, including staffing and consultants based on the nature of
the initial investment projects, will be identified and resourced.

Detailed Tasks and/or Expected Output

 
 

Activities to undertaken by the consultant are shown below. In general, the international specialist
will take the lead and act as team leader for this first phase of activities. The national irrigation
modernization specialist and institutions specialist will report to the international irrigation
modernization specialist.

1. Review terms of reference (TOR) and SIMP objectives to prepare workplan.
2. Review existing literature (including NWUEISP and MFLW) and summarize and update good practices for
India.
3. Review and summarize national and state policies relevant to irrigation development, modernization,
operation and maintenance, increasing food production, farmer incomes and water use efficiency/crop
water productivity. Undertake a SWOT analysis and highlight opportunities for improvement under SIMP.
4. Explore national and state agencies, institutes and service providers that could support SIMP.
Highlight opportunities for strengthening them and for them to participate in SIMP. Highlight any
institutional gaps that SIMP could help address.
5. Summarize and update typology of India's MMIs prepared under NWUEISP study, identifying prevailing
issues, constraints to modernize and opportunities.
6. Organize a national workshop to discuss irrigation modernization needs and SIMP objectives with
interested states and central government agencies
7. Facilitate workshop and report on its findings
8. Develop initial project screening criteria for selection and prioritization of first batch of SIMP
projects
9. With interested states, identify about 3-4 MMI irrigation schemes as SIMP’s first batch for which
the CIMO will guide the state in preparing irrigation modernization plans following the framework shown
in Attachment 2.
10. Develop the modernization framework of each MMI and identify initial studies and site
investigations that will be required for preparing the first batch’s irrigation modernization plans.
11. Prepare information package on SIMP for dissemination to participating states.
12. Prepare schedule for preparing first batch irrigation modernization plans.
13. Estimate CIMO’s operating budget for its first 3-5 years of operation including costs for staffing,
consulting services, studies, surveys, travel, support staff and office operations.

Minimum Qualification Requirements

 
 

The specialists will have post-graduate civil engineering degree or similar, at least 15-years of
experience of assessing the performance of MMI irrigation systems and preparing irrigation modernization
plans, and preferably have considerable experience working in India or the region. All specialists will
be responsible for: (i) managing client relationships with the government and ADB; (ii) conducting
quality control of outputs from team members; (iii) preparing the necessary outputs; and (vi) supporting
ADB missions.